2018亚洲天天射,澳门黄色电影免费三级大毛片,337p欧洲大胆艺术,男人天堂色男人色天堂,三级黄色网站,91亚洲欧美,亚洲欧美日本另类激情

Electricians dispatched to repair high voltage wire to ensure post-holiday travel peak in China's Wuhan

Source: Xinhua| 2019-02-24 07:21:07|Editor: Li Xia
Video PlayerClose

CHINA-WUHAN-ELECTRICIAN-RUSH REPAIR (CN)

Photo taken on Feb. 12, 2019 shows an emergency worker climbing the power transmission tower for the rush repairs in the mountain area of Wuhan, capital of central China's Hubei Province. A team of electricians was dispatched to repair a high voltage wire that was broken due to thick layer of ice accumulation. After one day's work on the over 40-meter-high power transmission tower in bad weather condition, the team succeeded in fixing the failed power system that lowered the trains' speed causing delay during the post-holiday travel peak. This year's Spring Festival travel rush started on Jan. 21 and will last till March 1, with railway trips expected to hit 413 million in total, up 8.3 percent. (Xinhua/Xiao Yijiu)

   Prev 1 2 3 4 5 Next  

KEY WORDS:
EXPLORE XINHUANET
010020070750000000000000011100001378454891