2018亚洲天天射,澳门黄色电影免费三级大毛片,337p欧洲大胆艺术,男人天堂色男人色天堂,三级黄色网站,91亚洲欧美,亚洲欧美日本另类激情

 
Chinese firm completes beam closure along China-Laos railway
                 Source: Xinhua | 2019-01-20 09:15:42 | Editor: huaxia

The photo shows Chinese workers cast concrete at the site of the first cast-in-place continuous beam of the China-Laos railway at the under-construction Nathon Station Double-track Super Major Bridge, some 360 km north of Vientiane, capital of Laos, Jan. 19, 2019. (Xinhua/Huang Zongwen)

NAMOR, Laos, Jan. 20 (Xinhua) -- A Chinese engineering company has completed the closing of the first cast-in-place continuous beam on Saturday.

China Railway No. 5 Engineering Group (CREC-5) told Xinhua that at 03:20 local time on the same day, the company successfully completed the closure with cradle construction technique, at the under-construction Nathon Station Double-track Super Major Bridge, some 360 km north of Lao capital Vientiane.

The cast-in-place continuous beam is of 36+64+36 meters, part of the 1,195.822-meter bridge.

The construction of the railway bridges along the China-Laos railway made a breakthrough in 2018. China Railway No. 2 Engineering Group (CREC-2) has completed the main work construction of Nam Khone super major bridge, the longest bridge along China-Laos railway, also the longest-ever bridge in Laos in June. In July, all the foundation construction work of all the two cross-Mekong River super major bridges, namely the the Luang Prabang bridge and Ban Ladhan bridge, has been completed by CREC-8.

The China-Laos railway has a length of over 414 km with bridges of 62 km under construction, linking Mohan-Boten border gate in northern Laos and capital Vientiane. Operating speed on the route is designed at 160 km per hour.

Back to Top Close
Xinhuanet

Chinese firm completes beam closure along China-Laos railway

Source: Xinhua 2019-01-20 09:15:42

The photo shows Chinese workers cast concrete at the site of the first cast-in-place continuous beam of the China-Laos railway at the under-construction Nathon Station Double-track Super Major Bridge, some 360 km north of Vientiane, capital of Laos, Jan. 19, 2019. (Xinhua/Huang Zongwen)

NAMOR, Laos, Jan. 20 (Xinhua) -- A Chinese engineering company has completed the closing of the first cast-in-place continuous beam on Saturday.

China Railway No. 5 Engineering Group (CREC-5) told Xinhua that at 03:20 local time on the same day, the company successfully completed the closure with cradle construction technique, at the under-construction Nathon Station Double-track Super Major Bridge, some 360 km north of Lao capital Vientiane.

The cast-in-place continuous beam is of 36+64+36 meters, part of the 1,195.822-meter bridge.

The construction of the railway bridges along the China-Laos railway made a breakthrough in 2018. China Railway No. 2 Engineering Group (CREC-2) has completed the main work construction of Nam Khone super major bridge, the longest bridge along China-Laos railway, also the longest-ever bridge in Laos in June. In July, all the foundation construction work of all the two cross-Mekong River super major bridges, namely the the Luang Prabang bridge and Ban Ladhan bridge, has been completed by CREC-8.

The China-Laos railway has a length of over 414 km with bridges of 62 km under construction, linking Mohan-Boten border gate in northern Laos and capital Vientiane. Operating speed on the route is designed at 160 km per hour.

010020070750000000000000011100001377588261